Sheladiya Party Wall Surveyors
Free tool for homeowners

Party wall notice generator

Answer a few questions and we will draft the correct notice for you to give to your neighbour. It takes about five minutes and costs nothing.

For guidance only. This tool and the notes on this page are general guidance and are not legal advice. You must carry out your own checks before issuing any notice, including the owners' names, the type of notice, the drawings and the dates. Sheladiya Limited does not accept any responsibility for an invalid notice, or for any loss or delay arising from the use of this tool.

1What work are you planning?

Tick every type that applies. You can choose one, two or all three.

Not sure which applies? Plain-English guide with sketch:

Many projects need more than one notice. A typical rear extension needs both a Section 1 and a Section 6 notice. One PDF is produced, with a separate notice and acknowledgement form for each type you tick. Every notice that applies to your work must be issued.

2Fill in the details

You (building owner)
Your neighbour (adjoining owner)

Tick a type of work in step 1 and its questions will appear here.

3Your notices

No notice selected yet
Tick the type or types of work in step 1 to see your notices here.

When you download the PDF, a copy of the notice and the details you entered is sent to Sheladiya for our records. We do not contact your neighbour. See our privacy notice.

One PDF contains a separate notice and acknowledgement form for each type of work you ticked. Your neighbour ticks, signs and returns the acknowledgement forms. Text in [square brackets] still needs filling in. Print two copies of each notice, sign both and keep one.

Before you hand it over

  1. Talk to your neighbour first. A friendly chat and a look at the drawings prevents most disputes.
  2. Give a notice to every owner. That means the freeholder and anyone with a lease longer than one year. Flats usually need several notices.
  3. Attach your drawings. Use the drawing checklist below for the notice you are sending.
  4. Send it by post and keep the proof. Every notice that applies to your project must be posted to each owner. Ask the Post Office for a certificate of posting, or use a signed-for service, and keep the proof with your copy of the notice.
  5. Allow 14 days for a reply. Written consent means you can start once the notice period ends. No reply or a refusal means surveyors must be appointed.

Serve all the notices your project needs. A notice lapses if work has not started within 12 months.

Prefer us to check and serve it for you? Ask a surveyor

Drawings to send with each notice

Tick a type of work in step 1 to see its drawing checklist.

A Section 6 notice without the required plan and section is invalid.

What happens if a notice is invalid?

An invalid notice has no legal effect. It is as if no notice was ever given.

  • You start again. A correct notice must be served and the full one or two month notice period restarts.
  • Any award can fail. An award based on an invalid notice can be challenged and set aside.
  • Work can be stopped. Your neighbour can apply to court for an injunction, and you may have to pay their legal costs.
  • You lose the Act's protection. This includes your rights of access and the agreed way of dealing with damage claims.

Common causes: owner names that do not match the Land Registry, an owner left out, the wrong type of notice, a vague description, missing drawings, a start date that is too soon, or no proof it was served.