Answer a few questions and we will draft the correct notice for you to give to your neighbour. It takes about five minutes and costs nothing.
Tick every type that applies. You can choose one, two or all three.
Not sure which applies? Plain-English guide with sketch:
Use this when there is no wall at the boundary now (or only a fence) and you want to build one there, such as the side wall of an extension. There are two versions.
Use this when you will carry out building work to a wall or structure you share with a neighbour: the wall between semi-detached or terraced houses, a garden wall built across the boundary, or the floor between flats.
Use this when you will dig close to a neighbour's building, for example the foundations of an extension or a basement. Their wall does not need to be shared. There are two tests.
General guidance only. If you are unsure which notice applies, ask us before you serve it.
Many projects need more than one notice. A typical rear extension needs both a Section 1 and a Section 6 notice. One PDF is produced, with a separate notice and acknowledgement form for each type you tick. Every notice that applies to your work must be issued.
Tick a type of work in step 1 and its questions will appear here.
Start date on this notice: 16 December 2026. One month after the notice date.
Start date on this notice: 16 January 2027. Two months after the notice date.
Start date on this notice: 16 December 2026. One month after the notice date.
When you download the PDF, a copy of the notice and the details you entered is sent to Sheladiya for our records. We do not contact your neighbour. See our privacy notice.
Your PDF is ready. Open or save the PDF
Your PDF has been saved.
The PDF could not be created in this browser. Please try another browser or contact us.
Tick at least one type of work in step 1 first.
One PDF contains a separate notice and acknowledgement form for each type of work you ticked. Your neighbour ticks, signs and returns the acknowledgement forms. Text in [square brackets] still needs filling in. Print two copies of each notice, sign both and keep one.
Serve all the notices your project needs. A notice lapses if work has not started within 12 months.
Tick a type of work in step 1 to see its drawing checklist.
A Section 6 notice without the required plan and section is invalid.
An invalid notice has no legal effect. It is as if no notice was ever given.
Common causes: owner names that do not match the Land Registry, an owner left out, the wrong type of notice, a vague description, missing drawings, a start date that is too soon, or no proof it was served.