What to expect during a schedule of condition survey
A schedule of condition is a written and photographic record of a property before building work starts next door. It protects both owners: the neighbour has evidence if damage occurs, and the building owner is protected against claims for defects that were already there.
When it happens
The inspection takes place after surveyors have been appointed and before any notifiable work begins. Where a neighbour has consented to the work, a schedule is still worth having and can be arranged by agreement.
What the surveyor looks at
The surveyor inspects the parts of the neighbouring property closest to the work. Typically that means the rooms along the shared wall, ceilings and floors in those rooms, the roof space if a loft is being converted, and the outside walls, paths and garden structures near any excavation.
Existing defects are noted room by room and photographed: hairline cracks, stained ceilings, loose plaster, sticking doors, cracked tiles. The aim is an accurate record, not a judgment on the property.
How to prepare
- Allow access to every room along the shared wall.
- Move furniture away from those walls if you can, so they can be seen clearly.
- Point out anything you already know about, such as old cracks or past repairs.
- Expect the visit to take around an hour for a typical house, longer for larger properties.
What you receive
The schedule is written up with the photographs and issued to both owners, usually attached to the party wall award. Read it when it arrives and say straight away if you think anything is missing.
After the work
When the work is finished, the property is checked again against the schedule. If new damage is found, the building owner must put it right or pay compensation, and the surveyors settle any disagreement about the cause or the cost.